MEP coordination is the invisible backbone of every fit-out. When it fails, the result is ceiling height loss, rework and programme delays that cascade through every subsequent trade.
Common failure points
- Cable tray and ductwork clashes above the ceiling plane
- Lighting layout conflicts with HVAC diffusers
- Raised floor plenum encroached by underfloor services
- Fire damper locations blocking access panels
We run coordination reviews at schematic, detailed design and pre-installation stages — not after the ceiling grid is up.